Types of Building Permits
Massachusetts requires permits for most construction work to ensure safety and code compliance. Professional Massachusetts contractors handle permit applications as part of their comprehensive services.
Building Permits
- New Construction $500-2,000+
- Additions $300-1,500
- Renovations $200-800
- Roofing $150-500
- Siding $100-300
Mechanical Permits
- HVAC Installation $200-600
- Ductwork $150-400
- Boiler/Furnace $100-300
- Heat Pump $150-350
- Ventilation $100-250
Electrical Permits
- Service Upgrade $200-500
- New Circuits $100-300
- Outlet Installation $75-200
- Generator $150-400
- Solar Installation $300-800
Plumbing Permits
- Bathroom Renovation $200-500
- Kitchen Plumbing $150-400
- Water Heater $100-250
- Sewer Connection $300-700
- Well/Septic $500-1,500
Permit Application Process
Prepare Documentation
Gather required plans, specifications, and supporting documents for your project.
- Architectural drawings or sketches
- Site plan showing property boundaries
- Structural calculations (if required)
- Energy compliance forms
Submit Application
Submit completed application with all required documents and fees to local building department.
- Complete permit application form
- Pay application fees
- Provide contractor information
- Submit required number of plan sets
Plan Review
Building department reviews plans for code compliance and safety requirements.
- Zoning compliance check
- Building code review
- Fire safety requirements
- Accessibility compliance
Permit Issuance
Once approved, permit is issued and construction can begin.
- Receive approved permit
- Post permit at job site
- Schedule required inspections
- Begin construction work
📋 Required Documentation
All Permit Applications Must Include:
- Completed application form with property owner signature
- Site plan showing building location and setbacks
- Construction drawings with dimensions and specifications
- Contractor license information and insurance certificates
- Energy code compliance documentation
- Applicable permit fees
🔍 Required Inspections
Typical Inspection Schedule:
- Foundation: Before concrete pour
- Framing: After structural work completion
- Rough-in: Electrical, plumbing, HVAC before covering
- Insulation: Before drywall installation
- Final: Upon project completion
Inspection Scheduling: Call 24-48 hours in advance. Failed inspections require corrections and re-inspection.
Common Permit Fees by City
City | Building Permit | Roofing Permit | Electrical Permit | Plumbing Permit |
---|---|---|---|---|
Boston | $200-1,500 | $150-400 | $100-350 | $150-450 |
Worcester | $150-1,200 | $100-300 | $75-250 | $100-350 |
Springfield | $175-1,300 | $125-350 | $85-275 | $125-375 |
Cambridge | $250-1,800 | $200-500 | $125-400 | $175-500 |
Lowell | $125-1,000 | $100-275 | $75-225 | $100-300 |
Need Help with Permits?
Professional contractors handle all permit applications and inspections, ensuring code compliance and smooth project execution.
Get Permit Assistance